14.1 | Introduction | 4 |
14.1.1 | Hydraulics related important references | 4 |
14.2 | Design Practices | 4 |
14.2.1 | Piping Sizes and Schedule | 4 |
14.2.2 | Hydraulic Design Consideration | 5 |
14.2.3 | Design Margins for Line Sizing | 6 |
14.2.4 | Line Sizing Criteria | 6 |
14.2.4.1 | Hydrocarbon Liquid Line Sizing | 6 |
14.2.4.2 | Battery Limit Requirements | 8 |
14.3 | Calculations | 11 |
14.3.1 | Discussion Guidelines | 11 |
14.3.2 | Hydraulic Hammer | 15 |
14.3.3 | Vapour Line Sizing | 18 |
14.3.3.1 | Noise Considerations | 19 |
14.3.3.2 | Sonic Velocity, Vapor | 19 |
14.3.3.3 | Two phase flow – Maximum Velocity | 20 |
14.3.3.4 | Reboiler Return Line to Column | 20 |
14.3.3.5 | Compressor Suction and Discharge Lines | 21 |
14.3.3.6 | Crude Oil Vacuum Unit Furnace Transfer Line | 22 |
14.3.3.7 | Feed to a Column | 22 |
14.3.3.8 | Column Overhead Vapor Lines | 23 |
14.3.3.9 | Column Overhead Condenser Rundown Lines | 23 |
14.3.3.10 | Relief Valve Discharge Line to Atmosphere | 24 |
14.3.3.11 | Amine, Carbonate, and Sour Water | 24 |
14.3.3.12 | Sulfur | 24 |
14.3.3.13 | Sulfuric Acid | 25 |
14.3.3.14 | Sodium Hydroxide | 25 |
14.3.3.15 | Flare Lines | 25 |
14.3.3.16 | Vapour – Liquid Mixtures (Two Phase Flow) | 26 |
14.4 | Specialized Services | 29 |
14.5 | Utilities Line Sizing Guidelines | 30 |
14.5.1 | Water Systems | 30 |
14.5.2 | Boiling Water Lines | 30 |
14.5.3 | Cold Water Lines | 31 |
14.5.4 | Cooling Water | 31 |
14.5.5 | Fuel Oil to Heaters | 31 |
14.5.6 | Fuel Gas to Heaters | 32 |
14.5.7 | Steam Systems | 35 |
14.5.8 | Vacuum Piping | 41 |
14.5.9 | Utility Gas and Air Systems | 41 |
14.5.10 | Tank Overflows | 44 |
14.5.11 | Special Commodities | 44 |
14.5.12 | Slurry Line Sizing | 45 |
14.5.12.1 | Types of Flow Regimes | 46 |
14.5.12.2 | Limiting Settling Velocity | 46 |
14.5.12.3 | Slurry Velocity Selection Criteria | 47 |
14.5.13 | Bitumen and Hydrocarbon Slurry Piping | 48 |
14.5.14 | Relief and Vapour Depressurizing Lines | 48 |
14.6 | Hydraulic Circuits | 48 |
14.6.1 | Documentation Requirements | 48 |
14.6.2 | System Sketch | 48 |
14.6.3 | Operating Cases | 49 |
14.6.4 | Piping Segments | 49 |
14.6.5 | Piping Lengths & Fittings | 50 |
14.6.6 | Equipment Allowances | 51 |
14.6.7 | Regulating Control Valve Allowances | 51 |
14.7 | Non-Pumped Hydraulic Circuits | 53 |
14.8 | Two Phase Equations | 54 |
14.9 | Examples of Hydraulic calculations | 54 |
14.10 | Special Tip | 65 |
14.11 | Cooling Tower System | 66 |
14.12 | Abbreviations | 74 |
14.13 | Glossary of terms | 75 |
14.14 | References | 76 |