37.1 |
Introduction |
3 |
37.2 |
Flow Assurance Study |
3 |
37.2.1 |
Flow Assurance consists of the following analyses |
3 |
37.2.3 |
Applications |
3 |
37.2.4 |
Software |
3 |
37.2.5 |
Study results |
4 |
37.2.6 |
Flow assurance – two separate but connected studies |
4 |
37.2.6.1 |
Steady state flow assurance study |
5 |
37.2.6.2 |
Transient state study includes the following scenarios |
6 |
37.2.7 |
Design Data |
7 |
37.2.8 |
Few Important Details |
9 |
37.2.9 |
Surge analysis |
9 |
37.2.9.1 |
Potential Surge Pressure Hazards |
10 |
37.2.9.2 |
Pressure Wave Velocity |
10 |
37.2.9.3 |
Surge Pressure Rise |
14 |
37.2.9.4 |
Pressure Capability |
15 |
37.2.9.5 |
Allowable Surge Pressure |
15 |
37.2.9.6 |
Surge Mitigation Recommendations |
16 |
37.3 |
Reliability, Availability and Maintainability Study (Ram Study) |
22 |
37.3.1 |
Software used in RAM study |
22 |
37.3.2 |
Software |
23 |
37.3.3 |
Terms and definitions |
23 |
37.3.4 |
Input Documents required for study |
26 |
37.3.5 |
RAM Methodology |
26 |
37.3.6 |
Reliability Data |
26 |
37.3.7 |
Failure Rate Class Types |
27 |
37.3.8 |
Failure Rate Pattern (“Bath Tub Curve”) |
28 |
37.3.9 |
Maintainability |
28 |
37.3.10 |
Availability |
29 |
37.4 |
Multi Product Pipeline Batching Study |
30 |
37.4.1 |
Types of Pipelines usages |
30 |
37.4.2 |
Pipeline Batching |
30 |
37.4.3 |
Units of measurement used in formulae |
31 |
37.4.4 |
Terminology |
31 |
37.4.5 |
Objective of a batching study |
32 |
37.4.6 |
Basic Inputs Required for Study |
32 |
37.4.7 |
Assumptions usually taken in study |
32 |
37.4.8 |
Methodology |
33 |
37.4.9 |
Case Study of Product Batching |
38 |
37.5 |
References |
55 |