36.1 | Introduction | 3 |
36.2 | Definitions & Stages Involved | 3 |
36.2.1 | Definitions | 3 |
36.2.2 | Sequence of Activities | 5 |
36.2.3 | Management Issues | 7 |
36.2.4 | Technical Issues | 7 |
36.2.5 | Special Tip | 7 |
36.3 | Organogram for Startup | 9 |
36.4 | Precommissioning | 10 |
36.5 | Documentation Required by Process Engineer | 11 |
36.5.1 | Pre-Commissioning Procedures | 12 |
36.5.2 | Inspection and Testing | 13 |
36.5.3 | Clean Up Of Area | 13 |
36.5.4 | Site Preparation, Foundations and Structural Steel | 13 |
36.5.5 | Checking Plant against P&ID | 13 |
36.5.6 | Vessels and Tanks | 14 |
36.5.7 | Columns Inspection and Box Up | 15 |
36.5.8 | Heat Exchangers | 16 |
36.5.9 | Air Cooled Exchangers | 16 |
36.5.10 | Rotating Equipment | 17 |
36.5.11 | Electrical Motor Drivers | 18 |
36.5.12 | Pumps / Blowers | 18 |
36.5.13 | Compressors | 19 |
36.5.14 | Instrumentation (General) | 19 |
36.5.15 | Hydro Testing | 19 |
36.5.16 | Process Piping Flushing/Cleaning | 21 |
36.5.17 | Cleaning of lines and equipment | 22 |
36.5.17.1 | Flushing | 22 |
36.5.17.2 | Flushing Lines | 23 |
36.5.17.3 | Air Blowing | 24 |
36.5.17.4 | Dynamic Testing With Safe Fluids (Water Run) | 24 |
36.5.17.5 | Leak Testing | 26 |
36.5.17.6 | Leak Testing Procedure | 26 |
36.5.17.7 | Charging of Essential Utilities | 27 |
36.6 | Package Unit Pre-Commissioning | 31 |
36.7 | Pre-Commissioning of Electrical /Instrumentation Systems | 31 |
36.8 | Commissioning activities | 31 |
36.9 | Guarantee run | 31 |
36.10 | Budget allocation | 32 |
36.10.1 | Start Up Budget | 32 |
36.10.2 | Preliminary Estimate for Startup Costs | 32 |
36.11 | Time involved | 34 |
36.11.1 | Estimate for Startup Time | 34 |
36.12 | Checklists | 34 |
36.12.1 | Responsibility Matrix | 34 |
36.13 | Specific Procedures | 40 |
36.14 | Pre-Startup / Safety Review Checklist | 49 |
36.15 | Machinery Commissioning Checklist | 53 |
36.16 | References | 56 |